Martin Underwood wrote:
"Peter Lawrence" wrote in message
...

LU have announced that Herts CC have made a 'final' submission to the
DfT for funding for this project. The total cost is £65M (or ws last
year) and TfL is contributing £18M of this.



Is there a map showing the route of the link between the LU branch to
Watford LU and the disused Railtrack branch to Croxley Green? I presume that
Watford LU will be taken out of use, in the same way that Charing Cross
(Jubilee) is now redundant after the extension to Westminster and beyond.


http://tube.tfl.gov.uk/content/about...images/map.gif

Yes, Watford LU will almost certainly be abandoned.

--
Dave Arquati
Imperial College, SW7
www.alwaystouchout.com - Transport projects in London