Robin May wrote:
Stephen worheedatworheeddotf9dotcodotuk wrote the following in:
newspslyf6xh3wn44ge@stephen


On this subject I've read that all the
stations on the Lewisham extension were built so they could
either handle or be easily extended to handle 3 car trains. I
can't see how at Cutty Sark. It's only big enough for 2 car
trains and as is it's a deep level tunnel it is going to be quite
difficult to extend isn't it?



Are you sure it's not big enough? Last time I was there I think I had a
look and I seem to remember thinking that it probably was big enough
for three car trains.


Whilst waiting for a DLR at Lewisham several months ago, I read a poster
that said that they planned to extend the service on that section to
three cars. It said that some stations would have to be extended to
cope with this but that one of the stations (South Quay IIRC) could not
be extended in situ and so would have to be relocated, albeit only
100-200 yds.

The thing that immediately struck me as odd was that, for a two car
service, some of the stations had been built unable to cope with
anything longer.

What struck me as even more odd was that, this lack of forethought
having already (5years) caused a problem, the new South Quay was only
going to be long enough to cater for three car trains.