"Boltar" wrote the following in:
ups.com
James Farrar wrote:
Boltar wrote:
Robin May wrote:
Presumably they consider the EOR to be a new railway.
Seems unlikely to me. If that were the case then the whole of
network
southeast would have had to have been de-electrified when network
rail
took over from railtrack.
No, because service was continuous.
In that case the proposed extension of the met line over the derelict
network rail croxley line to watford high street is buggered then.
No, because that's an extension of an existing network.
--
message by Robin May.
Drinking Special Brew will get you drunk in much the same way that
going to prison will give you a roof over your head and free meals.
http://robinmay.fotopic.net