News Flash: Epping and Ongar line Easter Opening dates!!!
Robin May wrote:
"Boltar" wrote the following in:
ups.com
James Farrar wrote:
Boltar wrote:
Robin May wrote:
Presumably they consider the EOR to be a new railway.
Seems unlikely to me. If that were the case then the whole of
network
southeast would have had to have been de-electrified when
network
rail
took over from railtrack.
No, because service was continuous.
In that case the proposed extension of the met line over the
derelict
network rail croxley line to watford high street is buggered then.
No, because that's an extension of an existing network.
I think you're splitting hairs. If the Ongar line had never been
severed
from the rest of the central line but ownership had simply passed to
the
EOR I can't see how there could be any legal objections to it remaining
electrified.
B2003
|