On Mon, 14 Mar 2005 wrote:

In article . com,
() wrote:

I noticed that one of the sections to be closed is the Bank section on
the Northern line. This section was closed for 2 or 3 months in the
summer of 1999. I suppose that it was too much to ask that somebody
could have foreseen the work to be done in 1999. Two lengthy closures
in the space of 5 years smacks of taking the **** to me.


The reason for the shutdown is to deal with the problems after the work
that was carried out during the original shutdown!.


Are the contractors who did the first lot contributing anything to paying
for it this time round?
tom

--