Thameslink 2012 (Statement of Case)
John Rowland wrote:
"4.33 Since the first inquiry the Crossrail project team has worked
closely
with the
Thameslink 2000 project team to completely redesign the Farringdon
Crossrail
station at street level. The effect of the new Crossrail station
design is
to remove its
dependency on the Thameslink 2000 scheme. In particular the new
Crossrail
design
does not require use of the Moorgate branch"
Use of the Moorgate branch? I don't know what they mean, unless the
former
plan required widening of the Circle Line platform at Barbican.
It says the redesign is 'At street level'. It sounds like the disused
(following Thameslink 2000) Widened Lines were going to be used for
passenger access or buildings.
|