Integrating river services
In article ,
Aidan Stanger wrote:
TfL expect the entire project to cost £400m, and the bus lanes were
expected to come to 10% of the cost. Actually they did say "up to 10%" to
it could be less, though somehow I doubt it. Anyway, it would be an
appalling waste of money, as tolls would ensure that traffic on the
bridge would be free flowing anyway.
What would make those tolls any better than the tolls on the M25 crossing
(which doesn't keep the bridge free flowing)?
--
Mike Bristow - really a very good driver
|