View Single Post
  #1   Report Post  
Old August 19th 03, 10:50 AM posted to uk.transport.london
Colin Rosenstiel Colin Rosenstiel is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,146
Default Planned engineering works

In article ,
(Robin Mayes) wrote:

30/31 Kings Cross CTRL works No service Baker Street to Aldgate
(Met) and no service Baker Street to Liverpool Street via Kings Cross
(Circle)


Neither this nor the other CTRL works closures mention the H&C. Do we
assume that it will also be suspended between Baker Street and Liverpool
Street?

Thanks for posting these. I was caught out last Saturday by the
reintroduced weekend Circle closures with next to no warnings at King's
Cross.

--
Colin Rosenstiel