Thread
:
Extra Carraige on the Edware Road branch?
View Single Post
#
4
April 23rd 05, 08:14 PM posted to uk.transport.london
Colin Rosenstiel
external usenet poster
First recorded activity at LondonBanter: Jul 2003
Posts: 2,146
Extra Carraige on the Edware Road branch?
In article ,
(Dave Arquati)
wrote:
Chris! wrote:
I was supprised today to read in the leaflet for the conservative
candidate in Putney that:
"LU have agreed to add an extra carriage to Edgware Road tubes"
Is this possible? I thought the platforms were shorter beyond High St
Ken? Where are the carriages coming from - will there be less but
longer trains?
Or did she make it up?
The new common subsurface stock, due in 2011ish, will have walk-through
connections between carriages, and I believe it will have shorter
carriages too - presumably enabling it to run anywhere on the
subsurface network. Someone may be along shortly to correct me.
What I doubt is that any particular MP had anything to do with the
specification of the new SSL trains.
I thought they were designing the new stock for 6, 7 or 8 car trains with
car lengths similar to current A and C stock?
--
Colin Rosenstiel
Reply With Quote
Colin Rosenstiel
View Public Profile
Find all posts by Colin Rosenstiel