Why are Silverlink Metro trains NEVER on time ?
2) If the Metro service were entirely self-contained, and the extra
stock was available, then 12tph would be feasible (as witnessed at
Moorgate in the peaks, and that's with just *two* platforms).
And that's nothing compared to Brixton, which (IIRC) has the same
layout and handles 30tph in the peaks.
|