MaxB wrote:
What about some improvements to the South London Line? Reinstating a station
at Brixton (with platform level interchange to the main line) would be a
start!


This is being considered as part of the second phase of the East London
Line project, but it would cost an absolute fortune; the previous
station on the SLL at Brixton was halfway to Loughborough Junction, and
constructing new platforms at Brixton itself would be extremely
difficult. It would probably cost about £70m just by itself.


--