View Single Post
  #15   Report Post  
Old June 30th 05, 06:31 PM posted to uk.transport.london
asdf asdf is offline
external usenet poster
 
First recorded activity at LondonBanter: Feb 2005
Posts: 1,150
Default Piccadilly line reduced service was was Travelcards on Heathrow Express/Connect during LU closure

On Thu, 30 Jun 2005 19:17:55 +0100, Tom Anderson
wrote:

On Thu, 30 Jun 2005, asdf wrote:

Full details in the TfL press release at:
http://www.tfl.gov.uk/tfl/press-cent...s-releases-con
tent.asp?prID=398

The release also says:

"Customers can still travel between Central London and Heathrow on the
Underground via the Central line to Ealing Broadway then the District line
shuttle to Acton Town which will operate at a frequency of three trains
per hour and then the Piccadilly line to Heathrow Terminals 123"

Well, that's great. However, given that it takes 6 minutes for a train to
fo from Ealing Broadway to Acton Town, how on earth does the shuttle work
out at 3 tph? Even if it was worked by just one train, taking 6 minutes
either way and having a 3-minute rest, that's 4 tph!


Only 1.5 mins turnaround at each end, for the entire day, would be a
bit hectic...


I guess they'd have to step back. Other than that, i don't see why it
should be a big problem - after all, a normal station stop is shorter than
that.


Erm, what would be the point in stepping back? They'd need to have 3
drivers for that. They could just use 2 trains, have a higher
frequency, and only require 2 drivers.