View Single Post
  #6   Report Post  
Old August 26th 03, 11:07 AM posted to uk.transport.london
Cast_Iron Cast_Iron is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 313
Default Driverless trains.

Ed Crowley wrote:
"Cast_Iron" wrote in message
...

"Ed Crowley" wrote in message
...

"Richard J." wrote in message
...
CJG wrote:
If DLR can run without drivers. Why can't the Victoria
line have the drivers turfed out of the cab and down
checking tickets.
I know there is a higher frequency of trains on
Victoria than DLR. But surely if DLR can run safety
with no drivers then underground lines can?

DLR trains have a train captain (or whatever they're now
called) whose duties include opening and closing the
doors, and making sure that this is done safely. He can
do this from any of a number of points on the train
because the trains are short and the trains were
designed that way.

On the tube, trains are much longer, hence TV is needed
to enable the train operator to close the doors safely
with full visibility of the platform (some of which are
curved, unlike DLR). In practice this means that the
screens are either in the cab or at the front of the
platform. Duplicate screens and other equipment could be
provided elsewhere in principle, but I don't see how the
extra cost could be justified.

Couldn't a button be fitted on the platform that allows
platform staff to close the train doors when safe? You
then wouldn't need any staff on the trains at all ...


And what happens when the train comes to a sudden stop due
to mechanical failure? Are all passengers going to be
trained in remedying faults?


I would imagine an engineer would be called. What happens
on the driver-less airport shuttle trains such as those at
Stanstead and Gatwick?


They are very short and as far as I know each vehicle simply runs back and
forth along its own dedicated track. Such systems are in no way comparable
with any line of the London underground most of which has several dozen
trains.in service at any one time all of which may be carrying one thousand
passengers.

If such a policy were implemented and the engineer couldn't fix the problem
there is then a need for the train following the defective one to push it
out. Do you have any suggestions as to how that might work?