Thread: Hearsay
View Single Post
  #13   Report Post  
Old July 15th 05, 12:54 PM posted to uk.transport.london
downunder downunder is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2005
Posts: 4
Default Hearsay

Investigations have shown no structural damage to either Circle/H&S
roof/sidewalls. There is supeficial damage to cabling and the immediate
areas but this will not take too long to fix. The Picc is a different
story. However its possible the Vic line will be resume stopping at
Kings Cross later today. This will allow interchange with Met and
mainline/Thameslink. Northern still being assesed.
Just when i was starting to enjoy the summer walk from Euston.....