Thread: Hearsay
View Single Post
  #17   Report Post  
Old July 15th 05, 07:07 PM posted to uk.transport.london
Stuart Stuart is offline
external usenet poster
 
First recorded activity at LondonBanter: Apr 2005
Posts: 28
Default Hearsay

downunder wrote:
Investigations have shown no structural damage to either Circle/H&S
roof/sidewalls. There is supeficial damage to cabling and the immediate
areas but this will not take too long to fix. The Picc is a different
story. However its possible the Vic line will be resume stopping at
Kings Cross later today. This will allow interchange with Met and
mainline/Thameslink. Northern still being assesed.


What has prevented the Vic line opening so far? Obviously there is still
investigation and recovery work going on in the picc line section, but
what is it that passengers from the vic line need to be shielded from?