View Single Post
  #48   Report Post  
Old August 20th 05, 10:37 PM posted to uk.transport.london
asdf asdf is offline
external usenet poster
 
First recorded activity at LondonBanter: Feb 2005
Posts: 1,150
Default NYC and London: Comparisons.

On Fri, 19 Aug 2005 20:42:25 +0100, "Nigel Pendse"
wrote:

The Circle line through Barbican almost fits this description - it was
in open cutting before being rebuilt in tunnel when the Barbican
Centre was built.


Did they lower the level of the tracks when they built the Barbican
Centre? Or did they just use the valuable air space over the tracks in
the cutting?


Neither - the line was completely re-routed, the new route being in
tunnel.