NYC and London: Comparisons.
In article , Nigel Pendse
writes
"Between 1963 and 1965 a new shorter route was built for the line
between Barbican and Moorgate, south of and lower than the previous
alignment. While the old route was in the open, the deviation line was
placed in tunnels ready for the Barbican Centre to be built over it."
Presumably the Widened Lines were moved in the same way at the same
time?
Yes. In fact, the Widened Lines had to be moved first (think about it).
The connections from old to new alignments were each slewed over a
single weekend. Given that the *vertical* move was something like 2m,
this was quite a feat.
--
Clive D.W. Feather | Home:
Tel: +44 20 8495 6138 (work) | Web: http://www.davros.org
Fax: +44 870 051 9937 | Work:
Please reply to the Reply-To address, which is:
|