Thread: Victoria Revamp
View Single Post
  #8   Report Post  
Old September 7th 05, 10:00 PM posted to uk.transport.london
tim \(moved to sweden\) tim \(moved to sweden\) is offline
external usenet poster
 
First recorded activity at LondonBanter: Apr 2005
Posts: 95
Default Victoria Revamp


"Tim Bray" wrote in message
.. .
tim (moved to sweden) wrote:

I don't know if this is in the current plan, but the original
congestion busting proposal is to have a second platform
on the opposite side to separate the joining/alighting pax
flows


And then open the doors on both sides?

I think they would have to open the doors on the get off side a couple of
seconds before the get on side.


This is what happens in Munich.
There are anouncements on the train to alight from the
correct (by name) side. Regular travellers don't do it
wrong twice though, if you do get off the wrong side you
find yourself stuck on a platform with only down escalators
and no obvious way to get to another level (there are some
stairs but there are no signs to them)

That way people will manage to get off the correct side.


hopefully

tim