View Single Post
  #43   Report Post  
Old October 1st 05, 12:58 AM posted to uk.transport.london
James Farrar James Farrar is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2005
Posts: 905
Default Waterloo & City Line to Close for 5 Months

On Sat, 1 Oct 2005 01:06:24 +0100, Clive
wrote:

In message , Andy
writes
Apparently the trains are to be craned out during the closure for
modification.

That's the only way they will get out of the drain. Andrew

Considering all the years the Drain has been running why has a ramp not
been built to get trains out to B.R. or since conversion, as it's 92
stock connect it to the nearest tube at Bank or the nearest underground
line at waterloo.


There always was a way out but they built Waterloo International on
top of it.

--
James Farrar
. @gmail.com