Thread
:
Waterloo & City Line to Close for 5 Months
View Single Post
#
47
October 1st 05, 10:00 AM posted to uk.transport.london
Colin Rosenstiel
external usenet poster
First recorded activity at LondonBanter: Jul 2003
Posts: 2,146
Waterloo & City Line to Close for 5 Months
In article ,
(James Farrar) wrote:
On Sat, 1 Oct 2005 01:06:24 +0100, Clive
wrote:
In message , Andy
writes
Apparently the trains are to be craned out during the closure for
modification.
That's the only way they will get out of the drain.
Andrew
Considering all the years the Drain has been running why has a ramp
not been built to get trains out to B.R. or since conversion, as it's
92 stock connect it to the nearest tube at Bank or the nearest
underground line at waterloo.
There always was a way out but they built Waterloo International on
top of it.
It was somewhat limited though. There was an Armstrong lift but the
couplings and hoses had to be removed from cars to get them into it.
Craning out from the depot is probably less work.
--
Colin Rosenstiel
Reply With Quote
Colin Rosenstiel
View Public Profile
Find all posts by Colin Rosenstiel