View Single Post
  #4   Report Post  
Old February 2nd 06, 01:34 PM posted to uk.transport.london
Martin Smith Martin Smith is offline
external usenet poster
 
First recorded activity at LondonBanter: Sep 2003
Posts: 41
Default East London Line Extension

On 1 Feb 2006 15:18:55 -0800, wrote:
Is it the intention that eventually there will no longer be LU
involvement with this line and instead Network Rail will take over
infrastructure responsibility for both the existing and the extended
bits with an "overground" train operator running the services? Will
there only be a link to one or other of New Cross/New Cross Gate? Will
the depot at New Cross be shut and the stock transfer connection


On the original plan I saw some years ago the New Cross depot
was to be closed and a new one put in to the space where the ELL
diverges from the mail line at New Cross Gate, that site currently
houses a car pound, from the ELL you can see the decent looking ones
and from the main line you can see all the rubbish that has obviously
been dumped. However I am not sure what the current plans are, though
there has been some clearance work done quite recently on the west
side of the main line (at NXG) where the old stabling sidings are.


between the ELL and District Lines be removed? Will the existing
station at Shoreditch still be served?


Shoreditch is not on the agenda for the new line


--
gordon



--
Martin Smith