View Single Post
  #59   Report Post  
Old March 3rd 06, 03:13 PM posted to uk.railway,uk.transport.london
[email protected] J.P.Knight@lboro.ac.uk is offline
external usenet poster
 
First recorded activity at LondonBanter: Nov 2004
Posts: 7
Default Chiltern franchise aspirations

In uk.railway Graeme Wall wrote:
Easy enough, prefabricate the thing alongside, close the road overnight and
swing the thing into position when ready. Not exactly rocket science.


A bridge launch can be pretty quick. Some of the GCR engineering folk
visited the CTRL works in London a few years back on Xmas day to watch
one of their bridges being launched over existing rail lines. They
said that it was all over in a couple of hours - a metre or so every
few minutes.

Jim'll