View Single Post
  #3   Report Post  
Old June 12th 06, 03:58 PM posted to uk.railway,uk.transport.london,misc.transport.urban-transit
MIG MIG is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2004
Posts: 3,154
Default North London Line update


Dave Arquati wrote:
wrote:
asdf wrote:
On Sat, 10 Jun 2006 00:45 +0100 (BST), Colin Rosenstiel wrote:

Isn't another reason simply the fact that the Aldgate terminating
platforms are between the Circle platforms so involve fewer conflicting
movements that at Moorgate or, when the bay existed there, at Liverpool
St?
That's quite correct. Terminating the Met at Moorgate (or Liverpool
Street) would cause more than twice as many conflicting moves as
running it through to Aldgate.


Then that is a good reason for the status quo. :-) All the same one
cannot help but think that the Circle line needs some simplification.
If Crossrail happens then that could be a good opportunity to review
Circle Line operation.


AIUI there are already plans to ditch the Circle line in a few years
(after the new S stock is in place, I think) - by diverting the H&C east
of Liverpool Street to Edgware Road via Tower Hill and Victoria (the
"tea cup") and having the Met take over H&C services east of Liverpool
Street.




I was assured by someone commuting to Victoria via Liverpool Street
that the Circle Line was a myth, and it always had to be
Central/Victoria Lines.

But anyway, how would Aldgate to tower Hill be covered? How would
Edgware Road cope with terminating services from both Victoria and
Wimbledon? Is there a downloadable source for the plans?