"Nigel Pendse" wrote in message
...
"CJC" wrote in message
om

The tunnels from Hounslow West to Heathrow were built using the
cut-and-cover method that was used on the district/met lines when they
were built, unusually.


There is some cut and cover tunnel, but much of the Heathrow extension is
deep-bored, including all of the line under the airport itself.
Cut-and-cover would hardly have been an option for a line that was

tunneled
under an active and very busy runway, a number of taxiways, probably some
hangars and (presumably) Terminal 3.

Just because it was deep-bored doesn't mean it has to be small bore. In this
city there are deep level main line rail tunnels (for double deck stock) as
well as deep-bored road tollway tunnels (3 lanes each way).
Peter
Sydney