Thameslink 2011
asdf wrote:
How will they manage 16tph without the changes at London Bridge?
Few FCC services currently call at London Bridge during the peak hour -
when the works at Farringdon and Blackfriars are combined with Borough
Viaduct in Phase 1 (and I think the doubling of the single line between
Blackfriars and LB), 16tph may become possible.
|