View Single Post
  #4   Report Post  
Old January 27th 07, 01:42 PM posted to uk.transport.london,uk.railway
Roland Perry Roland Perry is offline
external usenet poster
 
First recorded activity at LondonBanter: Aug 2003
Posts: 10,125
Default City Thameslink gateline

In message , at 13:11:11 on
Sat, 27 Jan 2007, Sky Rider remarked:
2 - have they installed enough gates at both ends of the station
(available space permitting) to avoid a repeat of the peak-hour crush
at Farringdon?


There's a single escalator up from the platform, and that's more likely
to be the bottleneck.
--
Roland Perry