Thameslink 2000 Power
On Mar 7, 9:19 am, "Peter Lawrence" wrote:
On Wed, 7 Mar 2007 00:37 +0000 (GMT Standard Time),
(Colin Rosenstiel) wrote:
In article ,
(Phil) wrote:
If and when the Thameslink 2000 project takes place, are the plans
to keep the 3rd rail power supply south of the river and the
overhead supply north of the river or are there plans/aspirations
to make the whole lot overhead supply?
Yes. :-)
I'm not aware of any plans to change the changeover point.
I believe the latest plan is to move the changeover to City
Thameslink. (originally it was Blackfriars)..
Whats the point?
B2003
|