Thameslink 2000 Power
On Mar 7, 12:20 pm, "John Rowland"
wrote:
Boltar wrote:
I'm not aware of any plans to change the changeover point.
I believe the latest plan is to move the changeover to City
Thameslink. (originally it was Blackfriars)..
Whats the point?
The point is that if the panto gets stuck up or down, the train can't
proceed and will need to escape into the City Thameslink sidings rather than
get in the way of the other trains.
Presumably they'll keep the 3rd rail into the sidings then. What about
at Farringdon , will it be lifted?
B2003
|