View Single Post
  #18   Report Post  
Old March 15th 07, 11:40 AM posted to uk.transport.london
Boltar Boltar is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default A stock after closure of ELL

Once the ELL gets switched over the 3rd rail is St Marys curve going
to be lifted or will it be left intact just in case LU want to move
stock onto the national rail network at some point in the future?

B2003