View Single Post
  #16   Report Post  
Old March 20th 07, 01:06 PM posted to uk.railway,uk.transport.london
Boltar Boltar is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default Asfordby to be used to test air conditioned tube trains

On Mar 20, 11:24 am, "Recliner" wrote:
Does Tube Lines have a separate test track, apart from the 900m
signalling test track within Highgate depot or the fourth track at South


Is there the possibility for them to extend that track back through
the tunnel to highgate high level station if they wanted? Or would the
tunnel(s) require a refurb first?

B2003