Thread
:
Why the piccadilly to Heathrow , why not the District?
View Single Post
#
19
October 22nd 03, 08:22 AM posted to uk.transport.london
Boltar
external usenet poster
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Why the piccadilly to Heathrow , why not the District?
(Johnny Mo) wrote in message . com...
No one has yet noted there are legal differences between sub-surface
stock ( district line) and tube stock (picc). To put a district train
thru a single bore tunnel would require a whole new fleet. Tube (and
WAGN class 313) need lengthwise evacuation, sub-surface stock does
not.
But what about places where surface stock runs through single bore tunnel
such as under the river on the east london line and at earls court?
B2003
Reply With Quote
Boltar
View Public Profile
Find all posts by Boltar