View Single Post
  #16   Report Post  
Old July 21st 07, 10:58 PM posted to uk.transport.london,uk.railway
D7666 D7666 is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 529
Default HLOS - Thameslink rumours from Reuters

On Jul 21, 2:45 am, "Paul Scott"
wrote:

Quote
"Thameslink is going to be approved,"


Is it just me or do the Thameslink announcements always completely miss the
point? Nearly every statement made seems to include 'between Brighton and
Bedford' whereas the improvements cover a much wider area than the current
line...


Yes and no.

As I understand it now the aim of TL3000 is still a much wider area,
but the there is a sort of ''step 1'' that involves 12car platforms
and trains at Blackfriars and Farringdon (and hence Moorgate closure)
and selected stations north thereof - but does not for the time being
involve links with the GN route or with further routes south of the
Thames towards the Sussex coast.

I have picked up a lot of vibes over the last week - or rather the
amplitude of the vibes have increased substantially - that FCC/TL are
to gain over the next 2-3 years *both* the existing SN 377/2 and SET
375/6 fleets (15+30=45 units) - with AC activated on the latter -
for this ''step 1''.

Several different cascade scenarios have been suggested, including how
the both those fleets are to be released, but I have no idea which one
might be right, so for now I will refrain from comment. These
scenarios do allow for covering the existing 377/2 duties - and
375/6s.

What is known is that dual voltage Electrostars are already cleared
over the existing TL route - and apart from 319s they are the only
type that is so cleared.

--
Nick