View Single Post
  #31   Report Post  
Old July 23rd 07, 05:24 PM posted to uk.transport.london
Colin Rosenstiel Colin Rosenstiel is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,146
Default HLOS - Thameslink rumours from Reuters

In article ,
(Paul Scott) wrote:

"Colin Rosenstiel" wrote in message
...

From the closure of Blackfriars terminal platforms for
rebuilding on the other side of the station Southeastern will have
to run through the Thameslink tunnel to a turn-back station north
of London, but DfT has still to decide where..
This will require dual voltage trains for the services - which
are likely to be the 377s mentioned - running in "plain vanilla
livery" for FCC and Southeastern... I've not heard any mention of
ending the Southern service to Watford although with these all
being 4-car diagrams releasing some of the sets with 375s (which
have different couplers) would enable a common 377 fleet to be
available to Southeastern/FCC. So it's quite a logical idea and
one I'll ask about.


I thought the point of the Southern 377s was to release the
remaining 319s to FCC so they have the whole of that fleet?


I think the current buy of 377s is just a means of cascading the
remaining 319s to strengthen existing FCC services - and will
happen with or without Thameslink...


You seem to be confirming what I thought.

--
Colin Rosenstiel