On Jul 31, 5:04 pm, James Farrar wrote:
The greatest advantage of the four-track system [1] is that it allows
24-hour running.
I don't think this is actually as important as it's made out to be.
The system has a lot of two track sections that are also 24 hour, and
even in the four track sections one pair is generally in use 24 hours
a day, with only occasional diversions for engineering. It'd be
interesting to find out what working practices allow this and whether
they could be applied in London.
U
--
http://londonconnections.blogspot.com/
A blog about transport projects in London