View Single Post
  #36   Report Post  
Old August 14th 07, 10:14 PM
somersetchris somersetchris is offline
Junior Member
 
First recorded activity at LondonBanter: May 2007
Posts: 20
Default

Quote:
Originally Posted by John B View Post
On 14 Aug, 13:29, somersetchris somersetchris.
wrote:
I still think that the best thing they could do is extend the ELL to
Finsbury Park and then in the future extend it to Highgate/Muswell
Hill/Ally Pally. One bit at a time.


What's your solution to the flat-junction-with-NLL-in-steep-cutting-
with-houses-on-both-sides-hence-no-room-for-flyover problem, then?

--
John Band
john at johnband dot org
www.johnband.org
There will be a flat junction at Dalston which will have the lines from Stratford and the ELL meeting. There will also be a flat junction so both of these lines can access both number 1 and 2 lines through Highbury & Islington. So that is where the flat junction will be anyway, so why not use it and then send the trains via Canonbury tunnel to Finsbury Park?