Thread
:
Ongoing work at Finchley Central
View Single Post
#
9
September 2nd 07, 10:16 PM posted to uk.transport.london
Colin Rosenstiel
external usenet poster
First recorded activity at LondonBanter: Jul 2003
Posts: 2,146
Ongoing work at Finchley Central
In article ,
(Steve Dulieu) wrote:
"Robin Mayes" wrote in message
o.uk...
"Paul Corfield" wrote in message
...
It is to provide mobility impaired lifts. These are contracted
works as part of the PPP. The same type of work is being done at
Golders Green and Hendon Central on the Northern Line.
You mean, step free access (SFA) lifts, don't you? ;-)
Well, going through KX the other day there's a "MIP 3" (according
to the sign above it) lift up to street level from the circulating
area at the top of the escalators. So unless the ITB have changed
the current "flavour of the month" designation since KX was
remodeled, Mobility Impaired works for me...
That lift used by my daughter with my granddaughter in a buggy recently.
--
Colin Rosenstiel
Reply With Quote
Colin Rosenstiel
View Public Profile
Find all posts by Colin Rosenstiel