View Single Post
  #8   Report Post  
Old September 13th 07, 05:20 AM posted to uk.transport.london
[email protected] kevallsop@holdthefrontpage.co.uk is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2006
Posts: 46
Default Catenary in drayton park - moorgate tunnels?

On 12 Sep, 00:05, (Colin Rosenstiel) wrote:

An overrun all the way from Drayton Park to Highbury and Islington?
Surely not?


It runs as far as the south end of H&I SB platform.

Having it in the platform means that a train that has entered the
tunnel pan up can be visually inspected, and that the AC-DC changeover
can be cycled through (i.e pan down if still raised, go DC, go AC pan
up onto dead line, go DC.).