View Single Post
  #24   Report Post  
Old October 4th 07, 08:26 AM posted to uk.transport.london
Boltar Boltar is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 1,346
Default Crossrail noes fail

On Oct 4, 12:23 am, asdf wrote:
On Wed, 03 Oct 2007 01:52:11 -0700, Boltar wrote:
Question is , will they do the sensible thing and build the tunnels to
UIC gauge so there is at least the possibility of running dedicated
double deck trains through them alongside normal UK trains , or will
they build it to the hopeless 19th century UK loading gauge and then
complaints about undercapcity start to surface a few years after
opening?


Surely you mean, will they do the sensible thing and not waste money
building it to a larger loading gauge than that of the track at either
end?


This would be for trains dedicated to the new crossrail tunnel route
just like the shuttle trains at the channel tunnel. All they'd need to
do is have a depot at one end and a turnaround at the other. Normal UK
trains could also use the tunnel too of course for through journeys.

B2003