ELL construction work
Mr Thant wrote:
On 9 Oct, 11:50, Standing at HN28 signal
wrote:
The work has been underway for a while now. No sign of the old new
cross gate sidingr. From what i could see from the cab it looks like
it could be a diveunder rather than flyover though.
Definitely a flyover. They should be building quite substantial
embankments either side. A diveunder means closing the line for a long
time, whereas a bridge can be lifted in on a weekend.
Any idea why they are building up embankments?
On the approaches to Amsterdam there is a new line being built on
'stilts' - just like the elevated sections of the M5/6 in the W. Mids.
Surely that way would be much easier, and quicker to build than raising
an embankment to a suitable level?