View Single Post
  #8   Report Post  
Old November 8th 07, 10:50 AM posted to uk.railway,uk.transport.london
MIG MIG is offline
external usenet poster
 
First recorded activity at LondonBanter: Jun 2004
Posts: 3,154
Default After the Ball is over - Waterloo International

On 8 Nov, 11:05, "Peter Masson" wrote:
"kytelly" wrote in message

oups.com...



On 8 Nov, 10:21, "Alan Osborn" wrote:


A far better solution for the International Platforms would be for South
Eastern main line trains which at present have to negotiate the

congested
Borough Market tracks to reach Charing Cross. The Infrastructure to

divert
these is all in place curtesy of Eurostar, and use paths vacated by the
Eurostar trains
Charing Cross route would be downgraded and less congested as only used

by
suburban trains. For the die-hards who want to go to London Bridge or
Charing Cross then they could transfer to Waterloo East.


This sounds a good idea imho, at least while London Bridge/TLK is
being rebuilt


There are 5 main line trains into Charing Cross in the peak hour, or 8 if
you include trains starting from Tunbridge Wells, and nowhere near enough
paths for them between Bickley Junction and Linford Street Junction,
especially as, after pressure from TfL, the E paths have been allocated to
increasing frequencies of Victoria - Beckenham Junction - Orpington
stoppers. Even if trains have to be diverted away from Charing Cross during
Thameslink works, and paths can be found for them on the Chatham line,
Victoria (Chatham side) has spare capacity since the Boat Trains left.

Peter-


Yes; whenever this topic comes up, I comment that the problems are
with the approaches and not the capacity at termini, therefore not
addressed by freeing up more platforms at Waterloo.

The South Eastern side of Victoria is very underused, and Waterloo,
with its long turnaround times compared with somewhere like Charing
Cross, isn't exactly stretched.

The problems are Borough Market, the two two-track routes between
Bromley and Victoria and the two-track route through Queenstown Road
on the "Windsor" side.

It is true that there are capacity problems at Waterloo due to
platform lengths, but the Eurostar platforms are on the wrong side to
help much.

Incidentally, I note an interim stage in plans for Waterloo to be
increasing platform lengths to 10. With most trains in units of 4,
this isn't going to make much difference.