Thread
:
After the Ball is over - Waterloo International
View Single Post
#
53
November 16th 07, 12:27 AM posted to uk.transport.london
Colin Rosenstiel
external usenet poster
First recorded activity at LondonBanter: Jul 2003
Posts: 2,146
After the Ball is over - Waterloo International
In article ,
(Mark Brader)
wrote:
On another note, what is the deal for a prospective tunnel
connection to Ireland?
(Yeah, right.)
Connecting a network with standard 1435 mm track gauge to another
network with 1600 mm wide track gauge?
If that was the only problem, it wouldn't be a problem.
And then?
Most conveniently, what they do with some trains at the French-
Spanish border: slide the wheels along the axles to fit the other
gauge. Other solutions include mixed-gauge track, bogie changing,
and (of course) having the passengers change trains.
In the latter option it seems a bit pointless going to the expense of
building a tunnel.
--
Colin Rosenstiel
Reply With Quote
Colin Rosenstiel
View Public Profile
Find all posts by Colin Rosenstiel