View Single Post
  #57   Report Post  
Old November 19th 07, 11:34 AM posted to uk.transport.london
Colin Rosenstiel Colin Rosenstiel is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 2,146
Default After the Ball is over - Waterloo International

In article ,
(Tom Anderson) wrote:

On Mon, 19 Nov 2007, Colin Rosenstiel wrote:

In article ,
(Clive.) wrote:

In message
, Colin
Rosenstiel writes

Most conveniently, what they do with some trains at the French-
Spanish border: slide the wheels along the axles to fit the other
gauge. Other solutions include mixed-gauge track, bogie changing,


and (of course) having the passengers change trains.

In the latter option it seems a bit pointless going to the
expense of building a tunnel.

According to my Jane's world railways the high speed line into
Madrid is standard gauge, not the normal Spanish broad gauge.


What's that got to do with a tunnel under the Irish Sea?


It relates to how you deal with the problem of the UK being on
standard gauge and Ireland being on broad gauge, which would be
raised by the construction of such a tunnel - the analogy is that
if you're going to build the tunnel, you might as well build the
high-speed link on the Irish side to standard gauge, since it won't
have normal Irish trains running on it anyway.


But no-one was talking about an Irish high speed link!

--
Colin Rosenstiel