On 2 Jan, 12:02, "Graham J" wrote:
That article talks about the bridge removal works allowing the inference
that these works are the cause of the problems. *However according to the
'one' website that all went smoothly and the problem is the OHLE replacement
works in the station.
That sounds about right to me. I had another look at the bridge site
on Monday and the wires were back up and everything looked finished,
but further west there were lots of men in orange jackets milling
around (though no sign of any tools or equipment), and the OHLE looked
untouched.
U
--
http://londonconnections.blogspot.com/
A blog about transport projects in London