On 17 Jan, 16:44, "Peter Masson" wrote:
"Boltar" wrote
and when ELLX gets to Highbury & Islington the NLL tracks will be AC
between
Dalston and Camden Road, and the new NLL trains will run on AC all the
way
from Stratford to Acton.
Will the 3rd rail be lifted then?
The whole lot will probably have to be relaid anyway, to provide 4 platforms
at Canonbury and Highbury, and 4 tracks on the current 3-track section. I
can't see the juice rail surviving all that (except on the ELLX lines
between Dalston Junction and Highbury & Islington, as the ELLX will be an
entirely DC operation, and its trains, though in other respects essentially
the same as the new trains for the NLL, will be DC only).
Peter
Obviously under the arrangement for the ELLX up to Highbury &
Islington that has become apparent lately there's no need for the ELLX
rolling stock to have AC equipment, but I was under the impression
that all the new class 378 Electrostar trains for London Overground
were all ordered as dual system (i.e. AC & DC) stock - am I wrong in
thinking this, or has the order subsequently been amended?
|