View Single Post
  #55   Report Post  
Old January 20th 08, 06:02 PM posted to uk.transport.london,uk.railway
Paul Corfield Paul Corfield is offline
external usenet poster
 
First recorded activity at LondonBanter: Jul 2003
Posts: 3,995
Default North London Line AC/DC question

On Sun, 20 Jan 2008 10:05:51 -0800 (PST), D7666
wrote:

On Jan 20, 3:04 am, Paul Corfield wrote:

-- Why is it called V stock? I thought it was 09 stock.


Sorry but that's the "internal" term I keep hearing. Officially it may
well be 2009 stock but I've never heard that term until now.


I beleive 2009 stock is the term used in the weekly TC and/or EWSA -
especially the latter as the test trains appear as Engineers Trains. I
don't recall reading V stock anywhere - but I'm zero to do with BCV or
SSL.


Well I'm not involved in the BCV or SSL contracts either. I don't have
need to read the TC or EWSA so haven't seen the reference there but, of
course, a year based code is in line with all previous practice.
--
Paul C