View Single Post
  #29   Report Post  
Old January 29th 08, 07:51 AM posted to uk.transport.london
Mr Thant Mr Thant is offline
external usenet poster
 
First recorded activity at LondonBanter: Mar 2007
Posts: 973
Default Brent Cross Light Rail

On 29 Jan, 08:22, Paul Weaver wrote:
That's equivelent to a DLR at ~60 people per carriage, 2 carriage per
train, 8tph, more frequent than many branches.


Peak loading on the DLR is 200-300 people per articulated vehicle,
about the same as two tube carriages.

U

--
http://londonconnections.blogspot.com/
A blog about transport projects in London