View Single Post
  #40   Report Post  
Old April 6th 08, 11:54 AM posted to uk.transport.london,uk.railway,misc.transport.urban-transit
Mr Thant Mr Thant is offline
external usenet poster
 
First recorded activity at LondonBanter: Mar 2007
Posts: 973
Default Croxley Rail Link hits the sidings

On 6 Apr, 12:33, "Jonathan Morton"
wrote:
But why is it so expensive?


It requires a tall 500m viaduct which has to cross various obstacles,
rebuilding another mile and a half of track and building two new tube
stations, which go for £10-20m each. £95m is about right compared to
similar schemes, and it could be worse - the ELL extension is costing
£900m (which has about the same amount of new route) and rebuilding 3
miles of North London Line is costing £400m (with no new structures).

U

--
http://londonconnections.blogspot.com/
A blog about transport projects in London