Thread
:
Lords Cricket Ground disused tunnel
View Single Post
#
3
April 12th 08, 11:10 PM posted to uk.transport.london
Colin Rosenstiel
external usenet poster
First recorded activity at LondonBanter: Jul 2003
Posts: 2,146
Lords Cricket Ground disused tunnel
In article ,
(Tom Anderson) wrote:
On Fri, 11 Apr 2008, Colin Rosenstiel wrote:
In article ,
(Tom Anderson) wrote:
On Fri, 11 Apr 2008, Colin Rosenstiel wrote:
In article ,
(Tom Anderson) wrote:
On Thu, 10 Apr 2008, Adrian wrote:
At one point the Met. considered building a mainline size tube to
link their "Main Line" to Edgware Road Station.
To join up with the Circle heading west, you mean? Or as a
terminus? Neither of those sound like brilliant ideas to me, i
have
to say!
To join up with the Circle line heading East, actually. The
layout at Edgware Road was rebuilt with that link in mind and is
still that way today.
Was this before the link to Baker Street, or the link from the
platforms there to the Circle, went in, or am i missing something?
Before the Bakerloo extension to Stanmore.
I don't get it then. This link would have allowed trains to do
Finchley Road - Edgware Road - Aldgate? While they could already
do Finchley Road - Baker Street - Aldgate? Would the second link
somehow have increased capacity and allowed both Metroland and
Stanmore trains to run to Aldgate? Or was the idea to run Metroland
trains to the City via Edgware Road, and use all the Baker Street
platforms to terminate Stanmore trains?
The Bakerloo relieved the same stretch of line, the tunnels between Baker
St and Finchley Road.
--
Colin Rosenstiel
Reply With Quote
Colin Rosenstiel
View Public Profile
Find all posts by Colin Rosenstiel