On 2 May, 20:13, "Zen83237" wrote:
Well for £95m actually which makes it an incredibley expensive bridge and
mile of track.
The "one bridge" is a 500 metre viaduct, because joining the two lines
directly isn't possible without a sharp turn and a far bit of
demolition. Plus add two new high-spec stations.
U
--
http://londonconnections.blogspot.com/
A blog about transport projects in London