View Single Post
  #8   Report Post  
Old May 26th 08, 08:07 PM posted to uk.transport.london
Mr Thant Mr Thant is offline
external usenet poster
 
First recorded activity at LondonBanter: Mar 2007
Posts: 973
Default Stratford to Deptford Bridge

On 26 May, 20:23, MIG wrote:
I've noticed some bits of track being taken up recently. *One is the
siding at Mudchute, which probably has to go to make room for a
platform extension.


They're replacing the siding with a third platform.

http://londonconnections.blogspot.co...-platform.html

But I can't work out what's happening at "W. Curve", where the
junction between the two tracks has been moved east, leaving an unused
section of track up to just before where the line from Poplar joins.


They're creating a diveunder where trains that currently use the
southbound track of the West Curve will be diverted underneath the
East Curve, coming up alongside West India Quay station on its east
side (rejoining too late to have a platform there, in fact). The
northernmost part of the West Curve needs demolishing to achieve this,
so it makes sense for them to keep trains as far to the other side as
possible.

http://londonconnections.blogspot.co...n-upgrade.html

U

--
http://londonconnections.blogspot.com/
A blog about transport projects in London